EPSG & UKOOA - Defining Co-ordinates in Digital Data Exchange Formats



Introduction to the Offshore



UKOOA and the EPSG have been working together for many years. Through their collaboration, they have developed many standards and UKOOA has been open to listening to the industry about positioning in the North Sea.





When seismic data is acquired, whether it be 2-D or 3-D seismic surveys, the shotpoints (energy source, common mid-point, etc.) need to be positioned or referenced on surface.



Over the years UKOOA has developed various formats, named via a version and a year. This is a short introduction to how these files describe positions in the oil and gas industry.



UKOOA P1/90



Information is described in the Header for the file. The Header records following the convention listed below:



Record Identifer "H" Column(s): 1 Format: A1
Header Record Type 2-3 I2
Header Record Type Modifier 4-5 I2
Parameter Description 6-32 A27
Parameter Data 33-80 Varies



Using the above as a basis, let us take a look at how Datum and Spheroid information is described in this file.



Header records H1600 and H1601 are required for Datum Transformation parameters used by the Bursa-Wolfe Transformation.



Reviewing the Bursa-Wolfe Transformation (as vectors), we see the following:



X DX 1 -RZ +RY X
Y = DY + SCALE * +RZ 1 -RX * Y
Z DZ -RY +RX 1 Z



where

X,Y,Z are geocentric cartesian coordinates defined in metres
DX,DY,DZ are the translation parameters defined in metres
RX,RY,RZ are clockwise rotations defined in arc seconds,
but are converted to radians for use in the formula


SCALE = [1+S. (1oe-6)] where S is in parts per million



The Vertical Datum, is identified by Header record H1700. Some examples of the vertical datum, in relation to offshore work are:



LAT - Lowest Astronomic Tide
MSL - Mean Sea Level
SL - Sea Level
ES - Echo Sounder



The units of measurement are specified in H2001. These should be consistent with the position data. The height unit code will be 1 for metres, 2 for any other unit of measure. Header H2002 specifies the Angular unit code to 1 for degrees, 2 for grads.



Projection Data is specified in Header records H1800 to H2509

Currently, in this older format, the following projection codes were defined and used.



001 - UTM Northern Hemisphere
002 - UTM Southern Hemisphere
003 - Transverse Mercator (North Oriented)
004 - Transverse Mercator (South Oriented)
005 - Lambert Conic Conformal with one standard parallel
006 - Lambert Conic Conformal with two standard parallels
007 - Mercator
008 - Cassini-Soldner
009 - Skew Orthomorphic
010 - Stereographic
011 - New Zealand Map Grid
999 - Any other projection or non-standard variation of the 11 listed above



Since this initial positioning file was developed with the help of surveyors, they planned ahead and answered the question: What happens when we cross the Equator?



When a survey crosses from the South to the North, and the whole survey is shot on a Southern Hemisphere UTM Zone, the coordinates will possibly exceed 9,999,999.9. This is not acceptable in the P1/90 format, so Header record H2600 must indicate that 10,000,000 must be added to the co-ordinates.


More detail about this specification can be found here.





As the industry matures, new versions were released, the next in 1994. This was called p2/94 and was derived for raw marine positioning data.


UKOOA P2/94


During this time, differential positioning with GPS was just being implemented and the industry was beginning to rely on this technique more and more for offshore surveying.


This format is based on UKOOA p2/91 and has extended many of the definitions needed for differential GPS.


As operators maintain and store data in these formats, P2/94 also acts as an archiving format and records information such as the satellite ephemeride, ionospheric conditions and weather/meteorological conditions of the survey.


With the move to P2/94, Geodetic information moved to new headers, and are such described as:


H0100 Magnetic Variation - General Information
H0101 Magnetic Variation - Grid Data
H011# Datum and Spheroid Definitions


where # = 1..9 and is the datum & spheroid number


H0120 Seven Parameter Cartesian Datum Shifts
H0130 Other Datum Shift Parameters
H0140 Projection Type
H0150 (Universal) Transverse Mercator Projection
H0160 Mercator Projection
H0170 Lambert Projection
H0180 Skew Orthomorphic & Oblique Mercator Projection
H0181 Skew Orthomorphic & Oblique Mercator Projection cont.
H0190 Stereographic Projection
H0199 Any other Projection

Satellite System Definitions

H600# Satellite System Description
H610# Definition of Differential Reference Stations
H620# Satellite Receiver Definition
H6300 GPS parameter recording strategy
H6301 DGPS differential recording strategy
H631# GPS clock and ephemerides parameters
H632# GPS ionospheric model & UTC parameters
H6330 Meteorological parameters
H65## DGPS differential correction source defn
H66## DGPS differential correction source defn
H67@0 GPS ellipsoid height estimate


Rotation Conventions


Note that 2 different conventions are in use in the survey industry for defining rotations. This has led to considerable confusion in the GIS and mapping world. Both are valid when used properly.


The two conventions can be referred to as:



1) Position Vector rotation (Commonly used in Europe and referred to as the Busra-Wolfe)
2) Coordinate Frame rotation (Commonly used in North America)

I will talk more about these on a later blog, as it comes into play with a lot of GIS and mapping software.

More detailed information about the P2 format can be found here.


UKOOA P5/94


This version came along to facilitate the exchange of position data for pipelines, flowlines, umbicals and power cables offshore.


In these cases, the data required for pipeline positions are the Latitude, Longitude, Easting, Northing, Depth, and Kilometre Point (KP), along with the standard datum and map projection parameters.


Without wanting to bore my readers with more H records, you can found out more about how the pipelines are stored in this format here.


UKOOA P6/98



In 1998, a new version was developed for 3D seismic surveys and binning.



This is quite complex and would make this short blog even longer, so I'll write about this format at a later date.


The main emphasis of this blog, though, is to show how formats can change over time as technology and data sharing increases. It also points out the importance of knowing the format of your data, especially if you are doing historical work over a region - do not always assume a specific data format. This is partly why the OGP has started the Joint Industry Project I mentioned in an earlier post.


UKOOA P7/2000


Well's deviate. With the advent of horizontal wells and sidetracks, and relating to seismic surveys, we enter a whole other story again.


In this story, as well (bad pun!), we have to consider height measures (such as Kelly-Bushing), and the 4 Norths (which I will explain on a later post).


As this file type would make this blog even longer, I'm going to jump ahead to what the EPSG and UKOOA are doing now in defining the Header records for this specific part of the oil and gas industry.


How the EPSG comes into Play


Turning our eyes to the EPSG in P formatted files, we want to enable integrity checking of co-ordinate system definitions in UKOOA P1, P2, P5 and P6 formats, so a provision is made to describe co-ordinate system by reference to the European Petroleum Survey Group (EPSG) database of geodetic parameters. This is the group of codes we see in use throughout the GIS field and in products such as ESRI and PROJ.4.


What this allows UKOOA to do is to adopt an industry-standard name to be quoted where the geodetic co-ordinate system used is a common system. Defining parameters and units are then as given by EPSG and are not strictly required to be explicitly given in the P-format records.


As an integrity check, it is considered good practice also to include the explicit definition .The new records which can be used as extensions within the P1/90, P2/94, P5/96 and P6/98 formats are:



H8000 EPSG Geographic CS Name
H8001 EPSG Geographic CS Code
H8002 EPSG Projected CS Name
H8003 EPSG Projected CS Code
H8004 EPSG Vertical CS Name

H8005 EPSG Vertical CS Code
H8006 EPSG Database Version



As we know, co-ordinate systems may be two- or three- dimensional.


A vertical co-ordinate system is one-dimensional.


For the P1, P2 and P5 formats:



the H8002, H8003 and H8006 records are required when latitude, longitude, easting and northing but no height or depth are given;


the H8002, H8003, H8004, H8005 and H8006 records are required when latitude, longitude, easting, northing and gravity related height or depth are given;


the H8000, H8001, H8002, H8003 and H8006 records are required when latitude, longitude, easting, northing and ellipsoidal height or depth are given.



For the P6 format, the H8002, H8003 and H8006 records are required.



That is the way UKOOA and the EPSG see the offshore world when it comes to positioning and exploration in the North Sea and elsewhere.


Exploration & Production Blog


If you are interested, I also write another blog on the oil and gas industry, mainly describing where exploration is occurring, the technology being used, history of a region, some geology, etc. and some aspects of the UN Convention on the Law of the Seas.


The blog is located here.

Enjoy!

Monday, October 22, 2007

The Geoid - An Equipotential Description with Gravity




The Geoid is a surface that is not often talked about on blogs or mentioned on the web - so this may be a first.




The Geoid surface is irregular, unlike reference ellipsoids (such as Clarke 1866, Bessel, Hayford, etc.) which have been used to approximate the shape of the physical Earth at a local point. The geoid is considerably smoother than Earth's physical surface.




In looking for a good description that makes sense to many people, I stumbled upon this one on Wikipedia:




"In geodetic surveying, the computation of the geodetic coordinates of points is commonly performed on a reference ellipsoid closely approximating the size and shape of the Earth in the area of the survey. The actual measurements made on the surface of the Earth with certain instruments are however referred to the geoid. The ellipsoid is a mathematically defined regular surface with specific dimensions. The geoid, on the other hand, coincides with that surface to which the oceans would conform over the entire Earth if free to adjust to the combined effect of the Earth's mass attraction (gravitation) and the centrifugal force of the Earth's rotation. As a result of the uneven distribution of the Earth's mass, the geoidal surface is irregular and, since the ellipsoid is a regular surface, the separations between the two, referred to as geoid undulations, geoid heights, or geoid separations, will be irregular as well."




and further it states:



"The geoid is a surface along which the gravity potential is everywhere equal and to which the direction of gravity is always perpendicular. The latter is particularly important because optical instruments containing levelling devices are commonly used to make geodetic measurements. When properly adjusted, the vertical axis of the instrument coincides with the direction of gravity and is, therefore, perpendicular to the geoid. The angle between the plumb line which is perpendicular to the geoid (sometimes called "the vertical") and the perpendicular to the ellipsoid (sometimes called "the ellipsoidal normal") is defined as the deflection of the vertical. It has two components: an east-west and a north-south component."




The reference surface for heights is traditionally taken as Mean Sea Level (MSL).




The geoid, as described above, is a surface of equal gravity potential which closely approximates mean sea level.



With GPS becoming more and more relevant in our daily lives, what is the height measurement we get?
The heights derived from GPS are relative to the GPS reference ellipsoid (WGS84). The separation between the geoid and an ellipsoid is known as the geoid-ellipsoid separation, or N value.




In a mathematical sense, we have the following then:




H = h - N




where H = Orthometric Height


h = Ellipsoidal Height (for example, the height above the ellipsoid WGS84)


N = Geoid-Ellipsoid Height (this is also called the Geoid Undulation)


Note that with N, that if the geoid is above the ellipsoid, N is positive. If the geoid is below the ellipsoid, N is negative.



How does mass effect the geoid and the ellipsoid?



Where a mass deficiency exists, the geoid will dip below the mean ellipsoid and where a mass surplus exists, the geoid will rise above the mean ellipsoid.



Where are the largest undulations?



Well, the largest undulations known, with the minimum in the Indian Ocean at a value of N = -100 metres and the maximum in the northern part of the Atlantic Ocean with N = +70 metres.



So how do we describe the shape and size of the Earth?



There are three surfaces to be considered:





  • The topography - the physical surface of the earth.


  • The Geoid - the level surface (also a physical reality).


  • The Ellipsoid - the mathematical surface for computations.


Mean Sea Level (MSL) points, an approximation to the geoid, and can be used as reference surfaces for height measurements (i.e. orthometric heights).



Ellipsoidal heights (such as those derived by GPS) have to be adjusted before they can be compared to the orthometric heights given on topographic maps.



The deviation between the geoid and an reference ellipsoid is called Geoid undulation (N). Geoid undulations can be used to adjust the ellipsoidal heights (H = h +/- N).



This is an introduction to the Geoid and the science of Geodesy. It hopefully clears up some questions about this surface.

I'll explain in more detail some of the formulations of the Geoid and how geodesists over time have tried to model it and some of the efforts being conducted presently to come up with a global gravity model to aid in height determination at a later date.

There are some very interesting projects going on in Africa, South America, and Canada.















Sunday, October 21, 2007

The Robinson Projection: Not shaped like an Egg



A Pleasing View of the World

The Robinson Projection came into being in 1963 and was introduced by Dr. Arthur H. Robinson.

This projection can be classified as a pseudo-cylindrical projection because of its straight parallels, along each of which the meridians are spaced evenly. The central meridian is also a straight line and all other meridians are curved.

The projection is neither equal-area nor conformal, therefore abandoning both for a compromise for creating what Dr. Robinson felt produced a better overall view of the world. This was the first map projection to be developed for commercial interests. Rand McNally felt that many of the map projections in use did not present the earth as a whole very well. With Mercator the poles were distorted. Robinson, was essentially contracted to develop a map projection that did not maintain angle, direction, or limit distortion, but was sanctioned to produce a map projection that "looked good" for books and atlases.

Remember maps are designed for one of the following 4 reasons:

  • Conformality - the shapes of places are accurate
  • Distance - measured distances are accurate
  • Area/Equivalence - the areas represented on the map are proportional to their area on the earth
  • Direction - angles of direction are portrayed accurately

Dr. Robinson specified the projection to be constructed by referring to a table of cartesian coordinate values at specific intersections of latitude and longitude. The intermediate locations are to be found by interpolation. Dr. Robinson developed the projection through a series of trials, continually iterating till he settled upon the meridian shapes and parallel spacing most pleasing to the eye. In comparison with other Map Projections, they are mainly developed or are formulated as mathematical equations.

Parallels are straight parallel lines, equally spaced between latitudes 38 degrees north and south. Space decreases beyond these limits. The Equator is 0.8487 times as long as the circumference of a sphere of equal area. The central meridian is a straight line 0.5072 as long as the Equator. Other meridians are equally spaced elliptical arcs and concave toward the central meridian. The scale is true along latitudes 38 degrees north and south, constant along any given latitude, and the same for the latitude of opposite sign (Robinson 1974; Snyder and Voxland 1989).

This map projection is also based on a sphere, not an ellipsoid. This is an important point to remember, as the earth is being modelled differently.

What is the true shape of the Earth?

The Earth, in actual fact, is shaped more like an egg, hence, even an ellipsoid is not the best model. In the past, when datum's were more local (such as NAD27, SAD69, Cape Datum, etc.), various ellipsoids were tied to local points on Earth. For NAD27, this was Meades Ranch, Kansas.

But back to the Earth's shape; it is very close to an oblate spheroid — a rounded shape with a bulge around the equator — although the precise shape (the geoid) varies from this by up to 100 metres.


The rotation of the Earth creates the equatorial bulge so that the equatorial diameter is 43 km larger than the pole to pole diameter.

What about height? A whole other story.

Interesting, eh? There are so many different ways to see the Earth. When we look at height systems and describe the geoid, we are describing an equipotential surface. But height is a whole other story, as gravity is involved and it is not as simple as getting the "Zed" or "Zee" measurement from your GPS.

I'll explain height later and how we can determine MSL (and where the "mean" actually comes from).